Medium voltage
Within some of the industrial projects Croon Caribe was responsible for medium voltage cabling and connections. At projects like the reverse osmosis drink water plants at WEB, the crane at the container terminal and Powerhouse 3 at Valero, these works involved 12KV cabling medium voltage distribution and 2,4kV cabling for motors and other equipment. At the windmill park at Vader Piet Croon Caribe supplied and installed the 30kV cabling between the 10 each 3 MW turbines and the central distribution panel.